Mega Block Timings: 10th March 2013

No mega block on Trans-harbour line.

The timings for mega block on central line are as follows:

Between Matunga and Mulund:
Fast trains leaving CST from 9.37 am to 2.51 pm will be diverted slow track between Matunga and Mulund stations. These trains will halt at all stations between Sion and Mulund during the block period.

During the block period, up fast trains will halt at Mulund, Bhandup, Vikhroli, Ghatkopar and Kurla as well.

Between Mankhurd and Nerul:
Harbour line services leaving CST from 10.12 am to 2.45 pm for Panvel / Belapur / Vashi will be suspended.

Harbour line services leaving Panvel / Belapur / Vashi from from 10.20 am to 3.04 pm for CST will be suspended.

Special local trains will run o­n CST – Mankhurd and Panvel – Thane sections during the block period. 
Harbour line passengers for Panvel / Belapur / Vashi are permitted to travel Via Trans Harbour Line / Main Line during the block period 

0 comments: